APRIL 12, 2025 FIELD WORK DAY

Thank you so much to everyone who has been coming out to help get things done on the fields before the season’s games kick off. Things are looking amazing. Also, a big thank you to everyone who bought or sold raffle tickets. We fell a little short of our goal, but it was still a success and someone’s family is going to have an amazing time using it. This work day will be our last big push work day to try to wrap up some things. What we do not get finished will be eeked out during the work week; trying to get it completed before the first home games on the 26th.
On this workday we will be focusing on: Install valve boxes at the hydrants behind fields 3, 7, and 6 Tractor last of dirt to field 5 to smooth out some rough spots Drag cut light poles behind field 5 and put at base of fence to stabilize the dirt build up Need 2 people to use drill (1/2” chuck tool) to install fence clips until they are all used Work on pitching mound on field 7 Continue building out dugouts on field 7 Begin work on backstop on field 7 dig and pour piers Install/build braces for batting cages to install cable system Paint remaining dugout frame and bullpen on field 7 Grade and stabilize bullpens on field 7 Finish screwing down dugout skins on field 3 Clean and ready concession stand and concession trailer Any help with tractors, skid steer, welder please contact Ostin directly for specific needs Bring your work gloves, drill, anything that you think might help. Hope to start at 8 am, but anytime you can help would be greatly appreciated!!